IEEE 1303-1994

IEEE Guide for Static Var Compensator Field Tests

General guidelines and criteria for the field testing of static var compensators (SVCs) before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.

Sponsor Committee
PE/SUB - Substations
Learn More
Status
Superseded Standard
Superseded by
1303-2011
Board Approval
1994-06-14
History
ANSI Approved:
1994-12-14
ANSI Withdrawn Date:
2011-09-09
Published:
1994-11-04
Reaffirmed:
2000-03-30

Working Group Details

Society
IEEE Power and Energy Society
Learn More
Sponsor Committee
PE/SUB - Substations
Learn More
Working Group
WGI4 - Static Var Compensator
Learn More
IEEE Program Manager
Patricia Roder
Contact
Working Group Chair
Mikael Halonen
No Active Projects
No Active Standards

1031-2000

IEEE Guide for the Functional Specification of Transmission Static Var Compensators

This guide documents an approach to preparing a specification for a transmission static var compensator. The document is intended to serve as a base specification with an informative annex provided to allow users to modify or develop specific clauses to meet a particular application.

Learn More

No Inactive-Withdrawn Standards

1031-2011

IEEE Guide for the Functional Specification of Transmission Static Var Compensators

An approach to preparing a specification for a transmission static var compensator is documented by this guide. The intention of this document is to serve as a base specification with an informative annex provided to allow users to modify or develop specific clauses to meet a particular application.

Learn More

1303-2011

IEEE Guide for Static Var Compensator Field Tests

General guidelines and criteria for the field testing of static var compensators (SVCs), before they are placed in-service, for the purpose of verifying their specified performance are described. The major elements of a commissioning program are identified so that the user can formulate a specific plan that is most suited for his or her own SVC.

Learn More

Subscribe

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.