IEEE Recommended Practice for the Measurement of Radio Frequency Emission from Industrial, Scientific, and Medical (ISM) Equipment Installed on User's Premises

This document describes equipment inspection and radio frequency (rf) electromagnetic field measurement procedures for evaluation of rf industrial, scientific, and medical (ISM) equipment installed in the user's facility. The term, “ISM equipment,” as used here, includes equipment that generates rf energy for purposes other than radio communications, to cause physical, chemical, or biological changes; for example, industrial heaters (dielectric and induction), medical diatheremy, ultrasonic equipment, rf plasma devices, and rf stabilized welders. These procedures are designed to help ensure that the equipment does not interfere with radio communications, navigation, and other essential radio services. The engineer responsible for the measurements should take all reasonable precautions to ensure that the maximum emission from the ISM equipment under test (EUT) has been measured. Radio frequency field-strength measurements of installed ISM equipment may be required if any of the following conditions exist:1) The emission from the EUT was not measured by the manufacturer. 2) Because of its size or special operating conditions, the EUT could not be tested before installation. 3) Installed ISM equipment is suspected of causing interference. 4) ISM equipment has been modified in a way that could affect its rf emissions. 5) As the equipment ages, there is a question about its continued compliance. Etc.

Sponsor Committee
EMC/SDCom - Standards Development Committee
Learn More
Status
Active Standard
Superseding
139-1952
Board Approval
1988-06-09
History
ANSI Approved:
1988-08-11
Published:
1988-12-12
Reaffirmed:
2012-06-08

Working Group Details

Society
IEEE Electromagnetic Compatibility Society
Learn More
Sponsor Committee
EMC/SDCom - Standards Development Committee
Learn More
Working Group
WG139 - Radio Frequency Emission Working Group
Learn More
IEEE Program Manager
Jennifer Santulli
Contact
Working Group Chair
Edward Hare
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards
Subscribe

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.