Active Standard

IEEE 1793-2012

IEEE Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines

Careful consideration of the physical and electrical characteristics of overhead lines and transmission cables are necessary in designing a transition structure between the two systems. Environmental and social factors also play a role in designing a transition. By considering the factors contained in this guide, the user will be better able to design a suitable transition that balances cost, operability, environmental factors, and future flexibility.

Sponsor Committee
PE/IC - Insulated Conductors
Learn More
Joint Sponsors
PE/T&D
Status
Active Standard
PAR Approval
2008-11-07
Board Approval
2012-12-05
History
Published:
2013-01-08

Working Group Details

Society
IEEE Power and Energy Society
Learn More
Sponsor Committee
PE/IC - Insulated Conductors
Learn More
Working Group
C23W/P1793_WG - Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines
Learn More
IEEE Program Manager
Ron Hotchkiss
Contact
Working Group Chair
Nathan Rochel
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards
Subscribe