Active PAR

P2800.1

Guide for Test and Verification Procedures for Inverter-Based Resources Interconnecting with Associated Transmission Electric Power Systems

This guide provides test and verification procedures for inverter-based resources interconnecting with transmission electric power systems. This guide specifies the test equipment, test conditions and test and verification methods for type tests, production tests, facility design and as-built evaluations and commissioning tests to be performed to demonstrate the interconnection capabilities and functions for equipment connected with transmission electric power systems. Included in the test and verification procedures are all performance and functional requirements for reliable integration of inverter-based resources into the power grid, including, but not limited to, voltage and frequency ride-through performance, reactive power control, power quality, and dynamic voltage support under abnormal voltage conditions. This guide may also specify verification procedures for generic steady-state short-circuit models for fault analysis, as well as, generic, fundamental frequency, stability-type models (root-mean-square, rms with positive-sequence and possibly negative-sequence representation) of inverter-based resources interconnecting with transmission electric power systems for bulk system stability studies and/or proprietary time-domain (electromagnetic transient, emt) models for verification of interconnection requirements of composite systems (facilities) at the point of interconnection..

Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More
Joint Sponsors
PE/EM
Status
Active PAR
PAR Approval
2018-09-27

Working Group Details

Society
IEEE Power and Energy Society
Learn More
Sponsor Committee
PE/EDPG - Energy Development & Power Generation
Learn More
Working Group
WSPPID/WSPI/WSPI-TV - Wind and Solar Plant Interconnection Test and Verification Working Group (WSPI-TV)
Learn More
IEEE Program Manager
Malia Zaman
Contact
Working Group Chair
LIANG GUO
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards
Subscribe

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.