Active PAR

IEEE P400.3

IEEE Draft Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems

This guide covers the diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or by means of an external voltage source. This guide does not cover the testing of compressed gas insulated cable or termination systems.

Sponsor Committee
PE/IC - Insulated Conductors
Learn More
Status
Active PAR
PAR Approval
2011-09-10
Superseding
400.3-2006

Working Group Details

Society
IEEE Power and Energy Society
Learn More
Sponsor Committee
PE/IC - Insulated Conductors
Learn More
Working Group
F04W/P400.3_WG - Guide for Partial Discharge Testing
Learn More
IEEE Program Manager
Ron Hotchkiss
Contact
Working Group Chair
Jody Levine
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards
Subscribe

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.