
This guide covers the diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or by means of an external voltage source. This guide does not cover the testing of compressed gas insulated cable or termination systems.
- Sponsor Committee
- PE/IC - Insulated Conductors
Learn More - Status
- Active PAR
- PAR Approval
- 2011-09-10
- Superseding
- 400.3-2006
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More - Sponsor Committee
- PE/IC - Insulated Conductors
Learn More - Working Group
-
F04W/P400.3_WG - Guide for Partial Discharge Testing
Learn More - IEEE Program Manager
- Ron Hotchkiss
Contact - Working Group Chair
- Jody Levine
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards