Active PAR

P400.3

Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems

This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems.

Sponsor Committee
PE/IC - Insulated Conductors
Learn More
Status
Active PAR
PAR Approval
2011-09-10
Superseding
400.3-2006

Working Group Details

Society
IEEE Power and Energy Society
Learn More
Sponsor Committee
PE/IC - Insulated Conductors
Learn More
Working Group
F04W/P400.3_WG - Guide for Partial Discharge Testing
Learn More
IEEE Program Manager
Dan Perez
Contact
Working Group Chair
Jody Levine
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards

400.3-2006

IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment

This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using partial discharge (PD) detection, measurement, and location. Partial discharge testing, which is a useful indicator of insulation degradation, may be carried out on-line or off-line by means of an external voltage source. This guide does not include the testing of compressed gas insulated systems or continuous on-line monitoring at normal service voltage.

Learn More

Newswire

Sign up for our monthly newsletter to learn about new developments, including resources, insights and more.