
Superseded by 576-2000. A guide to installation, splicing, termination, and field-proof testing of cable systems is provided. The aim is to avoid premature cable failure due to improper installation and mechanical damage during installation, and to provide a reference that can be specified for cable installations. This standard is not intended to be a design document; many of the problems of installation can be avoided by designing cable layouts with the installation limits of this recommended practice.
- Sponsor Committee
- IAS/PCI - Petroleum and Chemical Industry
Learn More - Status
- Superseded Standard
- Superseded by
- 576-2000
- Board Approval
- 1989-01-24
- History
-
- ANSI Approved:
- 1989-06-12
- Published:
- 1989-08-07
Working Group Details
- Society
- IEEE Industry Applications Society
Learn More - Sponsor Committee
- IAS/PCI - Petroleum and Chemical Industry
Learn More
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards