
A test procedure for impulse testing of insulated conductors (cables) and cables with accessories installed (cable systems) is provided. This procedure can be used as a design or qualification test for cables or for cable systems. This test procedure is not intended to replace any existing or future standards covering cable or cable accessories, impulse generators, impulse testing or voltage measurements. It is intended to supplement such standards by indicating specific procedures for a specific type of cable system or cable system component.
- Sponsor Committee
- PE/IC - Insulated Conductors
Learn More - Status
- Inactive-Withdrawn Standard
- Superseded by
- 82-2002
- Superseding
- 82-1963
- Board Approval
- 1994-06-14
- History
-
- Withdrawn:
- 2001-01-15
- Published:
- 1994-10-25
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More - Sponsor Committee
- PE/IC - Insulated Conductors
Learn More
No Active Projects
No Active Standards
No Superseded Standards
No Inactive-Withdrawn Standards
No Inactive-Reserved Standards