A guide to the technical requirements for the design, fabrication, testing, and installation of indoor gas-insulated substations (GIS) 1 kV up to 52 kV are covered. Parameters to be supplied by the purchaser are suggested and technical requirements for the design, fabrication, testing, and installations to be furnished by the manufacturer are established.
- Sponsor Committee
- PE/SUB - Substations
Learn More - Joint Sponsors
-
PE/SWG
- Status
- Active PAR
- PAR Approval
- 2019-06-13
- Superseding
- C37.122.2-2011
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More - Sponsor Committee
- PE/SUB - Substations
Learn More - Working Group
-
WGK3 - Application of Gas-Insulated Substations 1 kV to 52 kV
Learn More - IEEE Program Manager
- Patricia Roder
Contact - Working Group Chair
- Eldridge Byron
C37.122.2-2011
IEEE Guide for the Application of Gas-Insulated Substations 1 kV to 52 kV
The technical requirements for the design, fabrication, testing, and installation of indoor gas-insulated substations (GIS) 1 kV up to 52 kV are covered. Parameters to be supplied by the purchaser are suggested and technical requirements for the design, fabrication, testing, and installations to be furnished by the manufacturer are established.