This guide covers suggested test requirements for power system protection scheme testing, system application tests, the scope and level of tests based on the application, and benefits of the overall protective schemes testing. This guide encompasses overall system testing procedures (generators, line, line reactors, transformer, capacitors, special protection schemes, end-to-end testing, distributed application within substation, etc.) and data collection requirements, as well as the test procedure definitions. This guide describes the methods, extent, and types of system tests for protection applications at various voltage levels. Control functions inherent to the protective systems are included. Importance of line testing, indirect trip applications, open/closed-loop tests, and dynamic/nonlinear tests are also covered.
- Sponsor Committee
- PE/PSRCC - Power System Relaying and Control
Learn More - Status
- Inactive-Reserved Standard
- PAR Approval
- 2005-08-11
- Board Approval
- 2009-09-11
- History
-
- ANSI Approved:
- 2010-05-24
- Published:
- 2009-12-11
- Inactivated Date:
- 2021-03-25
Working Group Details
- Society
- IEEE Power and Energy Society
Learn More - Sponsor Committee
- PE/PSRCC - Power System Relaying and Control
Learn More - Working Group
-
C37.233_WG - Power System Protection Testing Working Group
- IEEE Program Manager
- Malia Zaman
Contact - Working Group Chair
- Don Ware
PC37.233
IEEE Draft Guide for Power System Protection Testing
Test approaches and procedures for the components and the overall protection and control system functions are presented. Test of equipment in the system protection scheme, associated communications equipment, auxiliary power supplies, and the control of power apparatus are addressed. Much of the testing emphasizes a bottom-up approach, in which the basic behavior of scheme components are verified first, followed by testing of interconnected components in a function-oriented assembly.