Active Standard

IEEE C37.242-2021

IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) techniques focusing on the overall accuracy and availability of the time synchronization system; (c) test and calibration procedures for PMUs for laboratory and field applications; and (d) communications testing for connecting PMUs to other devices including phasor data concentrators.

Sponsor Committee
PE/PSRCC - Power System Relaying and Control
Learn More
Status
Active Standard
PAR Approval
2015-10-26
Superseding
C37.242-2013
Board Approval
2021-03-25
History
Published:
2021-10-14

Working Group Details

Society
IEEE Power and Energy Society
Learn More
Sponsor Committee
PE/PSRCC - Power System Relaying and Control
Learn More
Working Group
C37.242_WG - Guide for Synchronization, Calibration, Testing, and instalation of (PMU) for power system protection and control
Learn More
IEEE Program Manager
Malia Zaman
Contact
Working Group Chair
Allen Goldstein
No Active Projects
No Active Standards

C37.242-2013

IEEE Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) Considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) Techniques focusing on the overall accuracy and availability of the time synchronization system; (c) Test and calibration procedures for PMUs for laboratory and field applications; (d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).

Learn More

No Inactive-Withdrawn Standards
No Inactive-Reserved Standards